Pauley was told to watch the directional run-off trench they dug to divert the pump flow. His job was to insure the velocity of water (approximately 3000 gal/min) did not eat away at the man-made levees directing the water. Got it?……
5 Comments
Pauley was told to watch the directional run-off trench they dug to divert the pump flow. His job was to insure the velocity of water (approximately 3000 gal/min) did not eat away at the man-made levees directing the water. Got it?……